Sofyan, Diana Khairani and Syarifuddin, Syarifuddin and Sayuti, M (2015) Fasilities Relayout by Using Conventional Method based on 5S (Seiri, Seiton, Seiso, Seiketsu And Shitsuke). In: Proceedings of The 1th Almuslim International Conference on Science, Technology and Society (AICSTS) 2015, 7-8 November 2015, Bireuen - Indonesia.
|
Text
ALMUSLIM02.pdf Download (1MB) | Preview |
Abstract
Production facilities design is one of many factors that influence company performance. This was caused by inefective facilities layout which make material flow poor, and the movement of material, product, information, equipment and labor cost is relatively high, that caused delay in finishing the product and of course adding the cost of production. Layout design in manufacturing industry is the first step in organizing production facilities layout and to have benefit of the area as much as possible. This was made to create smooth condition in materials flow, so that later can achieve material flow which is efficient and working conditions that are orderly. The layout factory problems that cannot be avoided by companies is in its operation. The distance of material movement from one department to other will create influence on increasing productivity and profitability. With high total material movement/year, it can make material handling costs will be high too. The research purpose is to know minimum material handling total, so that later on the best of final layout and can minimize cost of material handling. The Results of facilities relayout drinking water in PT Ima Montaz Sejahtera consists of some department must be added which in the beginning there are 7 (seven) department and after the design become 12 area Therefore the additional department don’t need additional area. This can be done by relayout and give the region or area for the part that there was not exist before. This research use method 5S in drawing up the facilities relayout in PT Ima Montaz Sejahtera to obtain layout that is more efficient, which is The Seiri and Seiton in mechanical warehouse, Seiso in production warehouse and all department, Seiketsu and Shitsuke in all departments.
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Subjects: | T Technology & Engineering > T Technology (General) |
Divisions: | Faculty of Engineering > Department of Industrial Engineering |
Depositing User: | Dr. M Sayuti, ST, M.Sc |
Date Deposited: | 05 Jan 2016 07:17 |
Last Modified: | 05 Jan 2016 07:17 |
URI: | http://repository.unimal.ac.id/id/eprint/466 |
Actions (login required)
View Item |